全過程工程咨詢 Whole process of engineering consulting service
對工程建設項目前期研究和決策以及工程項目實施和運行(或稱運營)的全生命周期提供包含設計和規劃在內的涉及組織、管理、經濟和技術等各有關方面的工程咨詢服務,具體包含以下階段:
規劃與設計階段 Planning and design phaseStudy on the concept of construction project.The Comparative Study on project investment schemes.●編制項目建(jian)議書;總體策(ce)劃(功能、投資、工期)Draw up project proposals, overall schemes(function, investment and time limit).●編(bian)制項目可(ke)行(xing)性研究(jiu)報告Drawing up the study report of project feasibility.Draw up project assessment plans.Draw up primary design budgetary reports.Draw up construction drawings and design budget reports.●按估算(suan)的建設(she)費(fei)用編制初步現(xian)金流(liu)量表和成本計劃Draw up primary cash flow tables and cost plans according to the estimated construction cost.●按(an)業主投(tou)資控(kong)制預算實(shi)施經(jing)濟限額設計Execute economic limitation design according to the clients’ investment budgetary.招標(biao)投(tou)標(biao)階段 Bidding phase●對(dui)工程合(he)約形式,招標方案提供意見Make suggestions for the style of engineering agreement and bidding schemes.●編(bian)制招(zhao)標(biao)文件,草擬合同(tong)條款,代理招(zhao)標(biao)手續Draw up bidding documents, sketch out contract items, and deputize bidding procedures.●編制詳細的(de)單(dan)項(xiang)工(gong)程(cheng)(cheng)/單(dan)位工(gong)程(cheng)(cheng)/分部分項(xiang)工(gong)程(cheng)(cheng)/分部位、分樓層的(de)工(gong)程(cheng)(cheng)量清單(dan),分析工(gong)程(cheng)(cheng)用料(liao)明細、機電設備采購明細Draw up detailed item projects, unit projects, subsection and item projects, and the quantity lists by location and floor, analyze the list of materials and equipment order.●從(cong)技(ji)術與經濟(ji)角(jiao)度分析標書,評(ping)標,為決標提供意見Make suggestions for the final decision of the bidding under the analysis of tenders and bidding evaluation from a technical and economic point of view.●與相關方進行標書(shu)和技(ji)術(shu)經(jing)濟(ji)談判Negotiate with the parties concerned about bidding documents in regard to technique and economy.●最后協助或代理簽(qian)訂工(gong)程合同(tong)Help sign the contract as an agent.實施階段(duan) Construction phaseHelp organize the meeting for the check of construction drawing check together.On site management for the project.●觀(guan)察施工現場,評估形象進(jin)度,以便計算和(he)審核中期進(jin)度款項On-the-spot check, assessment for image progress so as to calculate and audit progress payment.Execute an on-the-spot reconnaissance for concealed work.●對(dui)設計變(bian)更進行估(gu)值,以便確(que)認(ren)合同價(jia)款增減金(jin)額Assess the modification in drawings, so as to confirm the increased and decreased sums for the contract.●查詢材(cai)料、設備市(shi)場實(shi)際價(jia)(jia)格,以便招標釆購(gou)確(que)定價(jia)(jia)格Inquire about the actual prices of materials and machine markets, so as to ascertain the price forbidding.●定期編制工程報表(biao),列明(ming)進度及(ji)預(yu)算(suan)開(kai)支(zhi)執行情況和工程項目管理方面的業績(ji)及(ji)成果明(ming)細Draw up project report forms regularly, label out the implementation concerning progress and budget and the performance and the achievements in project management.竣工移交階段 The stage of completion and transferenceDrawing up and auditing project balance reports.●與相關方議定最終財(cai)務支付賬(zhang)目,包括處理(li)質量維(wei)修金(jin)、抵(di)扣款、罰(fa)金(jin)等項Confirm the final payment items with the parties concerned, including quality maintenance funds, deduction and penalties and so on.●建立健全項目(mu)管理檔案(an)資(zi)料Establish and perfect project archives.●提(ti)出項目(mu)預算執行情(qing)況分析報告(gao)Put forward the analytical report for the execution for budget.Provide consultation reports for project management.