丝袜 中出 制服 人妻 美腿_少妇人妻偷人精品视蜜桃_沦为公交两奶头春药高潮迭起_老熟妇仑乱视频一区二区

電話:  027-81321519
傳真:  027-81321519
郵箱:  dzgczx519@163.com
網址:  xxpj999.cn
地址:  湖北省武漢市洪山區文化大道555號融創智谷A7-4

您的位置: 首頁 ?  事業領域 ? 全過程工程咨詢 [ 返回 ]  [ 打印 ]

全過程工程咨詢 Whole process of engineering consulting service


對工程建設項目前期研究和決策以及工程項目實施和運行(或稱運營)的全生命周期提供包含設計和規劃在內的涉及組織、管理、經濟和技術等各有關方面的工程咨詢服務,具體包含以下階段:


規劃與設計階段  Planning and design phase

建設(she)項目概(gai)念研究
Study on the concept of construction project.

項目(mu)投資方案(an)比較研(yan)究
The Comparative Study on project investment schemes.

編制項目建議書;總體策劃(功能(neng)、投資(zi)、工期)
Draw up project proposals, overall schemes(function, investment and time limit).

編制項目(mu)可行性研究報告
Drawing up the study report of project feasibility.

編制項目投資估算
Draw up project assessment plans.

編制初步設計概算書
Draw up primary design budgetary reports.

編制施(shi)工圖設計預算書
Draw up construction drawings and design budget reports.

按估算的建設費(fei)用編(bian)制初步現(xian)金流量表和成本(ben)計劃
Draw up primary cash flow tables and cost plans according to the estimated construction cost.

按業主(zhu)投資控(kong)制預(yu)算實施經濟限額設計
Execute economic limitation design according to the clients’ investment budgetary.

招(zhao)標投標階(jie)段  Bidding phase

對工程合(he)約形式,招標方案(an)提供意見
Make suggestions for the style of engineering agreement and bidding schemes.

編制招標文(wen)件,草擬合同條款(kuan),代(dai)理招標手續
Draw up bidding documents, sketch out contract items, and deputize bidding procedures.

編制詳細的單項(xiang)工(gong)(gong)程(cheng)/單位工(gong)(gong)程(cheng)/分(fen)(fen)部(bu)分(fen)(fen)項(xiang)工(gong)(gong)程(cheng)/分(fen)(fen)部(bu)位、分(fen)(fen)樓層的工(gong)(gong)程(cheng)量清(qing)單,分(fen)(fen)析工(gong)(gong)程(cheng)用(yong)料明細、機(ji)電(dian)設備(bei)采購明細
Draw up detailed item projects, unit projects, subsection and item projects, and the quantity lists by location and floor, analyze the list of materials and equipment order.

從技術與經濟(ji)角度分析標書(shu),評標,為(wei)決標提供意見
Make suggestions for the final decision of the bidding under the analysis of tenders and bidding evaluation from a technical and economic point of view.

與相(xiang)關方進行標書和技術經(jing)濟談判
Negotiate with the parties concerned about bidding documents in regard to technique and economy.

最(zui)后協助或代理簽訂工(gong)程合同
Help sign the contract as an agent.

實施階段  Construction phase

協助組織施工圖會審(shen)
Help organize the meeting for the check of construction drawing check together.

工程(cheng)項目的現場(chang)管理
On site management for the project.

觀察施工現場(chang),評估形象(xiang)進度(du),以便計(ji)算和審核中期進度(du)款項
On-the-spot check, assessment for image progress so as to calculate and audit progress payment.

對隱蔽工(gong)程進行現場勘測記錄
Execute an on-the-spot reconnaissance for concealed work.

對設計變更(geng)進行估值,以便確認合同價款增減(jian)金(jin)額
Assess the modification in drawings, so as to confirm the increased and decreased sums for the contract.

查詢材料、設備市(shi)場實際(ji)價(jia)格,以(yi)便招標(biao)釆購確定價(jia)格
Inquire about the actual prices of materials and machine markets, so as to ascertain the price forbidding.

定期(qi)編(bian)制工程報表,列明(ming)進度及預算開(kai)支(zhi)執行情況和(he)工程項目管(guan)理(li)方面的業績及成(cheng)果明(ming)細
Draw up project report forms regularly, label out the implementation concerning progress and budget and the performance and the achievements in project management.

竣工移交階段  The stage of completion and transference

編制、審核工程結算書(shu)
Drawing up and auditing project balance reports.

與相關方議定(ding)最(zui)終財務支(zhi)付賬目(mu),包括處理(li)質量維(wei)修金(jin)、抵扣(kou)款、罰金(jin)等項
Confirm the final payment items with the parties concerned, including quality maintenance funds, deduction and penalties and so on.

建立健全項目(mu)管理檔案資料
Establish and perfect project archives.

提出項目預算執行情況分析報告
Put forward the analytical report for the execution for budget.

提供工程管理咨詢報告書(shu)
Provide consultation reports for project management.
地址: 湖北省武漢市洪山區文化大道555號融創智谷A7-4
電話: 027-81321519
傳真: 027-81321519
  |   網站管理  |     |  
Copyright ? 2024 Powered By xxpj999.cn All Rights Reserved 網(wang)站技(ji)術支持: